How it works

From room size to a material list

Four steps from dimensions to a shopping list. Live recalculation as you change openings or waste.

Takeoff flow: dimensions, openings, sheets, materials
  1. Set units and defaults. Choose US (inch fractions) or metric, and a default sheet size.
  2. Enter the room. Length, width, height. Toggle walls and ceiling.
  3. Subtract openings. Add doors and windows with presets or custom sizes so area matches the hang.
  4. Read the list. Sheets (rounded up), screws, mud, tape, bead and basic studs, plus a wall layout diagram. With Pro, add more rooms and export a PDF list or quote.

Related: opening deductions checklist · sheet count guide · takeoff checkup.